VI-EL-VI company, salon Shiraz

 

TSOVAGYUGH SECONDARY SCHOOL NAMED AFTER MURATSAN SNPO 31,16 կՎտ
TSOVAGYUGH SECONDARY SCHOOL NAMED AFTER MURATSAN SNPO
31,16 կՎտ
"PrintMan" Printing house, Shirak province, Gyumri 11.4 kW
"PrintMan" Printing house, Shirak province, Gyumri
11.4 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village 800 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village
The installation of 800 kW power plant was made with 14 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
01 July 2020
800 kW
"Ararat" restaurant, Syunik province, c. Kapan 99.96 kW
"Ararat" restaurant, Syunik province, c. Kapan
99.96 kW