Yerevan, Nork-Marash administrative district

Capacity

23.56 kW

Location

Yerevan, Nork-Marash administrative district

Solar modules

,AE SOLAR 380 W, monocrystalline 62 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

35340 kWh

Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
ARPI KINDERGARTEN 6,56 kW
ARPI KINDERGARTEN
Բարեգործական ծրագրի շրջանակում ամեն տարի մի քանի տասնյակ կրթական հաստատություններ անցում են կատարում արևային էներգիային։
6,56 kW
Kaputan secondary school 23,37 kW
Kaputan secondary school
23,37 kW